The 216 meter long Landwasser tunnel, which runs in a curve, ends in a vertically sloping rock face 65 meters high. This is followed by the 136 meter long Landwasser Viaduct, which runs in a radiu... (more)
This is the standard formation of the Albula Interregio trains. IR 1145 from Chur to St.Moritz is crossing the Stulsertobel I and II viaducts between Filisur and Stugl/Stuls, pulled by Ge 4/4 III ... (more)