The 216 meter long Landwasser tunnel, which runs in a curve, ends in a vertically sloping rock face 65 meters high. This is followed by the 136 meter long Landwasser Viaduct, which runs in a radiu... (more)
Interregio train 1145 from Chur to St.Moritz is crossing the Landwasser viaduct and entering the 216 meter long Landwasser tunnel. Locomotive (not visible) is Ge 4/4 III # 641 (Coop). In the rear ... (more)
This is the standard formation of the Albula Interregio trains. IR 1145 from Chur to St.Moritz is crossing the Stulsertobel I and II viaducts between Filisur and Stugl/Stuls, pulled by Ge 4/4 III ... (more)
Every full hour, in Filisur is the crossing of two Albula trains, one going northwards the other to the Engadine. Now most of this trains are of the new ALVRA permanently coupled 6 cars formation,... (more)