Preheating the Rail - BNSF MOW (Maintenance of Way) workers use an Oxy-Acetylene torch to preheat the ends to two adjoining sections of 136lb. rail in preparation to welding them together... (more)
Shearing the Excess - A BNSF MOW (Maintenance of Way) worker uses a hydraulic shear to remove excess iron from a molten weld produced from a Thermite reaction.
A wreck on the River Line shut the entire line down on January 27, 1979. What looks like a snow covered path in front of the auto carrier is actually the ROW. The tracks have been removed as part ... (more)
On a foggy December evening, a green light beams from the southbound Southern Railway signal at Oakwood. As seen, its replacement is already up, obstructing the view, though still allowing us to w... (more)