NS 20R crosses over from Main 1 to Main 2 at Leetsdale on September 16, 2016. A lot has changed since then as the PRR signal bridge was retired on September 22, 2019 and C40-9 8872 has been rebui... (more)
With this signal taken down 9/22/19 this is just memory of the PRR.
PRR signal bridge in background was taken down 9/22/19.
Possibly the shortest intermodal train I’ve ever seen (just 12 platforms!) passes under the old Pennsylvania Railroad position light signals in Leetsdale, Pennsylvania, on September 21, 2019. N... (more)
The Westbound Signals at Leets finally came down, and have provided so many railfans with photo angles of them passing through the bridge in both directions.
NS C35 passes under the PRR signals along with their replacements at Leets. Note the bad lean of the new signals. Nicknamed "The Leaning Tower of Leetsdale".
Removed PRR Signals at CP Leets. Workers have torched and lifted off the PRR Eastbound signals at Leetsdale and replacements are already in place.
Position Light Farewell- By the time most of you see this photo, the PRR position light signals shown in it will be gone. The westbound Capitol Limited passes beneath the signal bridge at ... (more)
NS C28 passes under the old and new signals at Leets, with less than 24 hours to go before the new signals are cutover.
NS 570 crawls toward CP Leets as 21M is lit through on Main 3. This was the last full day and night for these old PRR Signals, the next day, these will be removed from service.
Signal in background was taken down 9/22/19.
25Z passes beneath the eastbound home signals at CP Leets just east of Conway Terminal.
20T passes the endangered PRR position lights at Leets. The new westbound signal cantilever is hiding in the trees to the right.