alight power move over the switch to be attached with the grain cars
494 leaving kfs station after getting the permission from the control tower
empty grain train begin for moving to leave kfs central yard after getting apermission from tanta union station
The conductor takes a look at the wheels of the loco to make sure that everything is fine and under control.
the loco is moving back to be attached with the grain cars with anice smile from the engineer make my day anice one
496 begin to slow down there is fixing operations in the steel bridge
814 leaving kfs station after getting aclear signal
empty grain train waiting for aclear signal after passing of 504
490 heading to tanta station after getting the permission from the control tower
driver and assistant discuss what they will do after finishing there work.
876 entering the yard of kfs after the driver delivered the permission to the control tower.
814 in acurve b4 entring the kfs station
876 heading to tanta station in anice warm day
switch is ready for the monster to go then it will be converted to the main line as the loco will attached with the grain cars
492 heading to tanta station after taking the permission to leave kfs station