The Copper Basin OB-2 unloads the first half of the train into the dumper at Hayden. After dumping about half the train, the units will pull the cars through, then run around to pull the back hal... (more)
A pair of GP9s lead the "Work Train" back to the yard at Hayden. The train consisted of a b/o ore car, a flat with a bulldozer, an empty flat and 5 side dump ballast cars.