On the weekend of April 17/18th New York Atlantic Railway dropped CWR between New Hyde Park and Hicksville for the third track project. Usually CWR operations are handled by LIRR but on this occas... (more)
A Saturday extra RS70 is seen in the hole at LD siding in Riverhead. On their journey east they had engines on both ends allowing the crew to switch at Sills on the way east. When they arrived at ... (more)
The opening of the Third Track project was completed, from Floral Park to Hicksville, on Monday October 3rd. Highlights of the project include 9.8 miles of new track, eight grade crossings elimina... (more)
New York and Atlantic Railway RS41 crawls around the curve at Milepost 39 approaching the Elwood Road road crossing. This section of track was built at an angle to accommodate the faster passenge... (more)