Fireman Peter is throwing some more coal into the firebox of "Mogul" B 3/4 # 1367 before the run through the 15 kilometer long Gotthard tunnel to Airolo, pulled by Ae 6/6 # 11411 from SB... (more)
Stressfull? Hardly... After a cold winter, cutting rail the steel will expand (pull); now with the mild temperatures we destress the track (contract). With no hydraulic pullers available, we make ... (more)
A loaded export taconite train passes a prescribed burn near Matfield Green. The state of Kansas allows burning of prairie during the month of April, and the smoke and smell of fires is ever prese... (more)
Fire and Brimstone... heating the rails with a copious amount of coal and diesel fuel. With sledge hammer in hand, the hot rail is slowly knocked into place on a curved stretch crossing Straight C... (more)