BLF 720 holds the east main while meeting southbound FEC 101 roll off the Stuart Bridge one of the few single track sections of the Brightline project.
A Brightline Test service rolls across the St. Lucie River. The service drove a lot of "vocal ninority" opposition based on unfounded fears and misinformation.
Testing Brightline continues to run test services in preperation for a launch late in September.
FEC 101 trundles across the Stuart Bridge lead by 814, with 714 behind the LNG GEVO set. This bridge is slated for replacement.
A Brightline test train heads north for some high speed testing further up the line.
A Brightline test train heads south acoss the St. Lucie river as tropical showers blow in from the Atlantic. Start up is due near Sept 22 or so.
Testing testing BLF is testing on the run up to the start of service expected in late September.
The high priority 105 rumbles across the water in Stuart.
All Aboard Florida work train speeds thru Jensen Beach after touch up work on the Brightline project
The first 105 after Hurricane Idalia rolls through with a two GP's for solfo
The world famous Auto Train is about an hour to it's terminal in Sanford seen at Seville.
FEC 822 leads 905 on 8/22. Quite rare to see a solo GEVO especially on a local at that.
The FEC 105 returns north seen at Colfax a tiny spot about 5 miles west of Marineland. Sunday 105's continue to be a turn to New Smyrna and back.
The 202 rumbles over the tidewater, with a double LNG set.
Amtrak's Silver Star about 40 minutes down this morning.