With the last two trainloads of synthetic gypsum for the season delivered to the USG Washingtonville Plant, a lite power move of all engines is heading west for them to be placed into service elsewhere. The first two engines were at the plant in a significant snowstorm, thus the accumulated snow on them. The trailing two traveled to the plant after the storm and that lead unit is sporting a nice underframe snow pack.