An extra WNYP train took a string of empty hoppers to storage at Casino Siding in Salamanca.
An extra train was called to spray weeds on the Buffalo and Pittsburgh Aly Main.
A look at the Pennsy heritage unit passing underneath the Pennsy signal bridge located in Tipton.
A long short manifest with almost more power than cars today.
A empty coal train is making its way back to the mines passing through Tipton, PA
An extra RISI is making its way north through Portland Mills PA beside the Clarion River.
The Union Pacific 1943 Office Car special is seen here passing the Horseshoe Curve. The train is on its return trip back to home rails.
Narrow gauge track construction. B&W #5 provides air for the air dump hopper. A brand new switch has been put in on the main.
Buffalo and Pittsburgh local JB-1 made its way up to Saint Marys to serve the only online customer Dubrook which receives stone.
A ballast train was moved from the BLE north on the B&P with CN power leading it to Buffalo.
The Buffalo and Pittsburgh railroad had quite the train today. A loaded coal came south out of buffalo and made quite a ruckus.
Buffalo and Pittsburgh's Lady Jane loading job is seen here. The train will sit overnight and the crew will start loading tomorrow.
Buffalo and Pittsburgh's RISI is seen passing through Empire tunnel near Portland Mills.