NKP 358 once again wears its as-delivered scheme thanks to a collaboration between Fort Wayne Railroad Historical Society and Progress Rail. More than 12,000 volunteer hours went into the extensiv... (more)
The AK Steel turn rolls towards Calvin Yard where it will prepare to switch the mill.
17G roars out of Gallitzin Tunnel on a sunny September afternoon.
A line of high nose SD40-2's wait to have their cab torched off and replaced with new a Admiral cab.
A pair of first generation EMD's work Smith Transport on their way back to Duncansville.
Nickel Plate 765 puts on a show after loading a train full of happy passengers at the Brecksville Station.
After completing their work at Island Ave Yard, the C28 local rolls under the signal bridge at PC 10.8 with a rare highhood leading the way.
The second GP59E rebuild to come out of the Juniata Shops leads the C42 local out of Altoona.
Amtrak 145 spent much of the summer in the Pennsylvanian power pool. It is seen here after its station stop at Johnstown with the classic position light signals guiding the way.