Last Snow Storm the first week of March in 2006. NYAR RS 60 has GP38-2 271 & 261 pulling into YA Siding. The crew will switch Blue Linx to the left of the image.
New York & Atlantic RS 60 with MP15AC's 151, 159 with 10 stone hoppers heading through LIRR Ronkonkoma Yard. The crew will travel east to switch Prima Asphalt. LIRR Leaf Crusher still running thi... (more)
RS 60 with GP38-2 268 backing into Gershow Recycling. Low prices for scrap metal sees storage at this facility waiting for prices to rise. They are only shipping scrap to generate cash to cover co... (more)
RS 60 has dropped two center beams for Penny Lumber in Southold on the Team Track. GP38-2 271 & 268 will head back lite to Riverhead to pickup the rest of their train on LD Siding. Siding no longe... (more)
NYAR RS 60 with GP38-2 270 & 268 approaching Second Street RR Crossing in Brentwood.
NYAR RS 60 with GP38-2 270 in the lead with nine TLTX stone hoppers for Arriva Concrete in Yaphank. A quick walk up to the single track Main Line. This area fenced during LIRR second track projec... (more)
NYAR RS 60 with GP38-2 270 in the lead viewed from the pedestrian bridge that spanned the single track Main Line in Brentwood. It connected Suffolk Avenue to Brentwood Schools. Removed during LIRR... (more)
The crew is stopped on LD Siding waiting for the Greenport Scoot to pass heading east. Lunch is over and time to switch Paraco Gas to the west after picking up the rest of their train.
The crew is heading east after meeting a westbound LIRR MU bound for Penn Station at Central Islip Station. Engines GP38-2 270, MP15AC 159 and GP38-2 261 are working its way towards Ronkonkoma.