At 7.09 in the morning, the first northbound train 4624 from Poschiavo to St. Moritz arrives at Alp Grüm. The "Allegra" ABe 8/12 # 3512 pushes the track plow Xk # 9143 in front of it. I... (more)
After two days with about one meter of fresh snow, a wonderful day breaks. Shortly after seven in the morning the first train from Poschiavo just has reached Alp Grüm on 2091 meter above sea leve... (more)
At dawn, the first train of the Bernina Line pulls a light trail through the panorama curve of Alp Grüm. At the left edge of the picture, about 400 metres lower, you can see the light track that ... (more)
The first train of the day is waiting departure in front of the 1923 built large stone building of Alp Grüm station, restaurant and hotel, 2091 meter a.s.l. The train stopped with the cab exactly... (more)
When the first train of the day from Poschiavo via the Bernina Pass to St. Moritz reached the plane of Cavaglia at about 6.50 AM, the two pantographs of the Allegra trainset, each fitted with 3 gr... (more)
After two days with about one meter of fresh snow, a wonderful day breaks. Shortly after seven in the morning the first train from Poschiavo just has reached Alp Grüm on 2091 m above sea level. T... (more)
The first train of the day is rounding the 180 degree curve in Alp Grüm shortly after 7 AM. Temperature about minus 12 Celsius with a strong north wind. The lonely ABe 4/4 III railcar shoved a sp... (more)