U716 loads at UTAC's Fairlane processing plant with BLE 909-904-906 for power. Once loaded, the 137 car train will head back south to Proctor as U717. There are five B&LE tunnel motors assigned to... (more)
The sun has now dipped below the horizon and thus brings to the end the first day of 2024 as a trio of BLE motors glide along on the southbound trip back to Proctor with 137 cars of taconite pelle... (more)