Crossing Summit Road - A Westbound Union Pacific manifest train begins it's decent down the Cajon Pass on Main #2 after passing through C.P. Summit.
Yellow Rabbit Bush at Summit - An empty Union Pacific M.O.W. ballast train heads up the pass for another load of rock that will be dumped somewhere along the tracks down in the Los Angeles basin.
Mile 57 on the Cajon Sub - As Autumn comes to the desert, the shadows are getting longer and the background is greening up slightly and the Yellow Rabbit Brush blooms after the intense heat of the... (more)
Autumn Comes to Cajon - Now that October is here, the daytime temperatures in the pass have begun to cool down and the nights are becoming colder as Autumn sets in. I think it is interesting to l... (more)
A Winter Afternoon at Control Point Summit - BNSF #7712 leads a manifest train down the Cajon Pass towards the Los Angeles basin from Barstow California with the remainder of a pre-Christmas snow ... (more)
Pushin up the Pass - A lone DPU brings up the rear of a U.P. manifest train heading Eastbound up the Cajon Pass from the Los Angeles basin with the remainder of a pre-Christmas snow on the ground.