Freighttrain going west through Lanzhou - a chinese town with millions of inhabitants - and often wrapped up in smog. Since 1978 app. 1.600 locos of class SS3 has been built
The tracks were laid like this many years ago, so that freightcars could be washed and dryed
The farmers of Denmark are busy with the harvest in these weeks.
Built by ALCO in 1944 this engine along with several others were delivered from USA to The Sovjetunion as a waraid. Now EA 3070 rest as a monument in the midle of Siberia
Winter has struck Denmark, and many railways are strugling to keep up with the timetable. But the 1160 horsepowers of locomotive DL 10 keeps the snow away from the line.
The General Electric built NJ2 0061 and NJ2 0069 are hauling the Lhasa-Xining train K 918 with 14 cars on its way north above a village in the mountains of Tibet. Altitude 4.000 m (12.400 feet).
One of several specials this day with the purpose of training af new enginedriver. This sidebranch has only 2 freightcars left !
A freighttrain pulled by a class SS1 going east towards Nan Jing seen passing Xian main station. Class SS1 from 1968 was the first electric mainline engines in China. 819 locos were built untill 1... (more)
Intercitytrain headed for the danish capital Copenhagen - 230 miles away
At the servicearea passengertrains are prepared for the evening traffic.
The bridge across the river Gudenaa was finished in 1950. It replaced a steelbridge that was damaged during second world war