P14-EV120-T386 returning from an infrastructure evaluation run to Cranbourne at Oakleigh.
P17 and T386 running in push pull mode pass through Albion Junction with a rail train from the McIntyre Sidings.
CLF1 stabled with a rake of new SSR BGUY grain wagons at Appleton Dock.
CLF1-C501-CLF2 with 2MC5 empty SSR grain to NSW at Albion.
T381 leading an SSR works train from Warragul passes through South Kensington.
P17-T356-T381 with an SSR works train at Ascot Vale.
CF4403-CF4410-8030 with 3MS7 Qube cement train passes a stabled SSR grain consist led by CLF1-S311-CLF4-CLF2 at Appleton Dock.
CLF1-S311-CLF4-CLF2 stabled with an SSR grain consist at Appleton Dock.
G539-BL30 run past CLF1-GM27-S311-CLF2 stabled with an SSR grain consist at Appleton Dock.
S303-T387-T357 with an SSR works train at Appleton Dock.
P16-T364-T385 trail an SSR works train from Carrum through Bonbeach.
CLF4-GM27-S311-CLF1 accelerate through West Footscray with 5MC5 empty SSR grain to NSW.
SCT015 with 9743V steel wagon transfer to Laverton crosses the Maribyrnong River bridge at Footscray.
T385-T386 hauling a retired Metro Comeng set approach the McConnell Dowell rail plant yard in Sunshine North.
T386-EV120-T385 returning from an infrastructure evaluation run to Sunbury pass a Metro Comeng set at Footscray.