The Swanton Pacific was in operation Sunday as part of Al Smith Day at the Swanton Pacific Ranch. Smith, founder of Orchard Supply Hardware acquired the locomotives from the Overfair Railroad, par... (more)
At Curtis, MCR #38 is on the way back to McCloud with loads from both the Sierra Pacific Mill in Burney and from Dicalite at Cayton. Due to track conditions, the run from Burney to McCloud had bec... (more)
Climbing out of the Burney Basin at Cayton. The railroad was for sale at that point, but a year later no buyer had been found and the line shut down June 30th, 2006. The track (as far as I know) i... (more)
After a long delay, the Snow Train is finally on the move at Long Ravine. It is 3:30 PM today and the train is due in Emeryville at 4 PM. The UP was single tracking from Colfax to Bowman and it wa... (more)