CP 104 with CP 8611 solo/13 Potash/53 Platforms
Train 301 makes time through Marathon
Loram Rail Grinder RG309 waits for the evening to grind some rail's. As of late last year, the Rail Grinder no longer operates as a train but now uses TOP's with a CP foreman protecting.
Railgrinder staged in W. Shed track.
CP 104 heads eastbound with a 29 car block of grain on the headend
Passing a very empty W Yard.
CP 222 passes an empty E Yard.
CP 222 at the west end of Marathon.
CP 434 arrives to setoff 4 Sodium Chlorate and lift 12 kraft loads.
CP 8618 is about to duck under the signal tower at the west switch of Marathon.
CEFX 1026, CP 8832 pull 111 loads with CP 9132 shoving up the rear.
Some variety heads through Marathon. A SD40-2F, SD40-2B, and a leased GCFX SD40-2.
CP 106 heads through the siding on account of a dimensional container load. The container is clearly visable at the end of the straight stretch sticking out. A large box originating in Taiwan. Als... (more)
April Fools! ~ CP 106 idles with a little bit of train line to slow for a 25mph[55mph] over Peninsula Road.