By the early 1980s, the Rio Grande Zephyr was losing money. To reduce costs, the D&RGW was looking for ways to economize. By the summer of 1982, they tested alternative power arrangements to reduc... (more)
A two unit swing helper shoves on a coal train from the Horse Canyon and Sunnyside mines. Note the single track mainline in place between Colton and Soldier Summit. A second main track would be ad... (more)
On Seven Seven Seventy-Seven (July 7, 1977), Rio Grande Zephyr train #17 emerges from shadowy Spanish Fork Canyon into golden evening sunlight at Gomex. When on time, train #17 arrived at this loc... (more)
A Western Pacific GP35, wearing 'new image' livery, awaits an assignment on the WP main from Rio Grande's Roper Yard in South Salt Lake. The little EMD was built new for the WP in Nov. 1964.
Jim Ozment, Utah Division Engineer for the Rio Grande, prepares his Jeep highrail vehicle for highway travel near the old San Pete Valley Railroad depot in Moroni, Utah. July 4, 1975