Northbound at the north end of Bealville siding, getting ready to enter tunnel 2. It's late afternoon and the shadows are getting long....maybe a bit too long, there is really too much shadow in ... (more)
A southbound BNSF Z-train exits the 230-foot long Tunnel 1 to the left of the frame as it climbs toward Bealville while running on approaches behind a UP drag freight.