NS 25N passes the CPLs at Arthur shortly after the rear of NS 236 passed on the other main.
A pocket of sun shines through on NS 721 tied down in Bristol as snow from one of the first snowfalls of the season lingers on the ground.
NS 25N rolls west out of Bristol with some yellow and red of its own trailing.
25N sits tied down in the yard while 22A sits on the main waiting for the deadhead crew from Knoxville to arrive.
NS 15T works hard as it climbs up Christiansburg mountain with an EMD leader.
722 waiting for traffic about 3 miles ahead to clear up.
16T nears a crew change as it is shown here about 1.8 miles west of Bristol Yard with a surprise leader.
The two DPUs on 770 shove hard to get the rear of the train up the grade near Wyndale.
NS 25N twists west out of Bristol passing what is left of the fall foliage.
V40 enters the Bristol Yard running long hood forward with an OLS GP59 on the point. The brick building left of the train is the former N&W/SOU roundhouse.
V19 shoves across Commonwealth Avenue on the way to switch Bristol Asphalt.
15T, with a visitor from the midwest leading the way, rounds the corner at Ford and begins the journey toward Knoxville.
A loaded Herzog Ballast train rolls through the yard at Bristol as seen from looking over 37Q's train on tracks 6 & 7.
NS V40 returning back to the yard with a GP38-2 leading the way.
NS 15T sits crewless on the main line while the V40 and it's caboose roll past on the siding.