As part of the massive double tracking project up Steelton Hill in Duluth, CN is building new bridge over 108th Ave West. The old bridge and track alignment can be seen in the background.
CN (DMIR) 404 leads IC 6252 with empty mini-quads to be loaded with limestone. Lake Superior and Duluth's famous Aerial Lift Bridge can be seen in the background.