Having crested the 1.5% climb of the Green Mountains, VTR GP38-2 201 takes a breather as it is now braking for the next stretch on the downgrade side of the Green Mountains.
Getting closer to the Summit, the old Rutland Railroad Ludlow Depot is no stranger to big snow and certainly no longer stranger to the passing ethanol trains. VTR GP38-2 201 and GP40-2W 311 work ... (more)
Rolling upgrade at Baileys Mills, VT, the westbound 4,900' long empty ethanol train is maintaining a steady speed with the assistance of the rear end helper as the VTR GP38-2 201 and GP40-2W 311 p... (more)
Coming into town with two hoppers and 29 slurry tankers to be added with 30 more for Hoosick Junction. Nice that those low clouds drifted in the right direction this time... away from the train... (more)