Here is the second run-by of the 2816 before it got to Enderlin.
The CP 4-6-4 pulling into the yard track in Glenwood.
CP 2816 and the Milwaukee 261 getting ready to depart the old St. Paul Depot.
CP 2816 and the Milwaukee 261 the night before the double header.
CP 2816 sitting in the siding while the Milwaukee 261 pulls up along side it.
Now headed north to St. Paul the double header must stop at Winona to make a crew change, this was the last good shot of her before the rain came.
After being held up in a siding & now over 2 hours late, the double header makes its way toward Winona, MN.
The Double Header blasts through the open fields of MN.
The Double Header with CP 2816 & MILW 261 head toward it's first stop at Red Wing after being held up by the Empire Builder.
The Double Header with CP 2816 & MILW 261 head down Westminster Hill toward St. Paul Union Station
CP 2816 passes through the lift bridge at Hastings, MN over the Mississippi River.
Celebrating 150 years of steamboats and steam trains on the upper Mississippi, the Grand Excursion is in full swing at Red Wing. MILW 261 arrives at the depot and poses next to CP 2816, all whist... (more)