On this very foggy and overcasted morning the TP&W make a run from Peoria, IL to Galesburg, IL. Seen here the train is crossing the TZPR Illinois River bridge in Peoria.
The TP&W make a run to Galesburg, IL from Peoria, IL on the BNSF Peoria Sub. The line is down to 10 mph and it is taking crews around 6 to 7 hours to make a one way trip.
A TPW job gets ready to head west away from the rising sun after switching the grain elevator on the west side of town. Note the TP&W written on the crossbuck post.