On February 24, 2016, winter rains have made the grass-covered hills on Tehachapi Pass a verdant green as an eastbound (southbound) Union Pacific intermodal climbs the grade toward the Allard hors... (more)
In the dry and hot places of the Tehachapi mountains, UP power lead by AC45CCTE No. 8156, cross the tunnel No. 5 on the way down to Bealville in Tehachapi Pass.
New GE ET44AC locomotive leading Union Pacific stack train which approaches the tunnel No.2 between Caliente and Bealville, by Tehachapi Pass in UP Mojave Subdivision. In the background, a train o... (more)
UP power approaching tunnel No. 5 on the way down to Bealville in Tehachapi Pass. At the background and bottom, movement of a BNSF train in Caliente going up to Bealville, to intersect with this U... (more)
With the rear of its train still passing through Tunnel 1, BNSF 4258 leads its eastbound train through Tunnel 2 and toward the southern end of the Bealville siding and it battles the grade up Teha... (more)