Re 620 # 081 "Immensee" (Re 6/6 # 11681) and Re 620 # 009 "Uzwil" (Re 6/6 # 11609) are leaving the 1365 meter long Leuk tunnel and crossing the 79 meter long bridge over the Da... (more)
At the beginning of April, the transport of excavated material from the construction site for the second Gotthard Road Tunnel in Göschenen to Flüelen started. Freight train 67664 from Göschenen... (more)
The Holcim train 67787 to Bodio is normally hauled by two Re 620 (Re 6/6). On July 12, 2022, it was on its way with the two Re 620 #068 "Stein-Säckingen" and #086 "Hochdorf".
The excavated material from the construction of the second tunnel tube of the Gotthard road tunnel is transported from Göschenen to Flüelen, where it is dumped in Lake Lucerne to create shallow ... (more)
The excavated material from the construction of the second tunnel tube of the Gotthard road tunnel is transported from Göschenen to Flüelen, where it is dumped in Lake Lucerne to create shallow ... (more)