a freight train waits at the port for its turn to unload
Some repairs in those years ,today it is being repaired to receive a heritage scheme.
Drone view of Alianza yard.
Waiting for an empty load, the 8280 can be seen as modification to EMD 12-567 engine
After a general repair repowered by EMD 12 645 diesel engine
Loaded train to Terminal 6.
Loaded train to General Lagos.
Empty train to Cevil Pozo.
Freight train to Rosario.
Empty train to Darregueira.