An eastbound APL stack train makes its way over the Feather River and under the big arch bridge of U.S. Hy 70.
A westbound UP pig train drops through a cut blasted out of rock by the State of California when building a new WP line in 1960; the new line bypassed Oroville Dam.
An eastbound APL stack train headed for Chicago blasts uphill through James.
A trio of C36-7s, two still with "Missouri Pacific" on their flanks, brings a manifest into Oroville out of the Feather River Canyon.
With snow on the ground, an OAAP6 out of the Port of Oakland approaches the west portal of Spring Garden tunnel.
An eastbound APL stack train pops out of tunnel 7, only to enter tunnel 8 fifty yards or so further east. These are the "Twin Tunnels," built by the State of California as part of construction of ... (more)