HIAWATHA UT Aug. 22 1981 -- Utah Railway RSD-15s 403, 401 and 402 belch smoke as they apply tractive effort to a cut of cars.
HIAWATHA UT Aug 22 1981 -- Utah Railway RSD15s 402, 401 and 403 smoke it up as they begin to pull on a cut of cars at the Hiawatha loadout. Unit 403’s smoke show puts much of the area in shadow.... (more)
Here's one for the Alco fans! An RSD-12, two RSD-4s and a single RSD-5 shove a long train of coal empties up the steep Wattis Branch the morning of Sept. 3, 1978. The 600 is a former Chesapeake & ... (more)
A well powered Mohrland Turn heads west through Hiawatha on the return to Martin Yard.
On a warm July 10, 1993 morning, 84 loads of Star Point coal depart the Wattis Plateau loader for Intermountain Power.
Lonely but intact in a once booming coal train yard, Utah Railway's train depot at Hiawatha feels the heat of a warm July afternoon in 1993. The stucco clad structure was once a joint station when... (more)
On a gorgeous July morning in 1993, an 84 car Intermountain Power coal empty is loading at the Wattis Plateau flood loader near Hiawatha. The facility was designed to ship 200,000 tons of coal ann... (more)