CP run-through on the old Monon rounds the curve at Orleans.
Two Conrail 6 axels and a CSX SD60 lead an INRD potash train through downtown Orleans.
the loaded potash train has completed backing into the siding and the power will cut off an go to the service facility in NS Youngtown yard
A loaded CP potash train has just arrived at the NS Youngtown yard, via trackage rights over the CSX's former Monon line. The train is about to back into Panama siding which is along the Ohio Rive... (more)