Southbound loaded X72 at Araraquara loop, between the yards of TutĂłia and Ouro.
Southbound train X72 headed by Eldorado SD70ACe #9568 eases the curve at Km 240, arriving at Viracopos yard, at region of Campinas. In the next months we expect to see double track at this region.