After shoving about 11 miles up from the junction with the Pokey main at Arrow, the crew of U14 have finally reached the Jamboree load out, which is out of view to the right.
A coal drag exits the Mingo Tunnel. This tunnel is set to be modified during the Heartland Corridor Project next year.