Switching Keystone.
Eastbound and passing Snag Pond.
PO-74 starts the workday.
Today;s PO-74 power at Sunrise.
PO-74 stopped to switch Keystone.
After a very active morning, PO-74 heads east past Snag Pond.
PO-74 gets underway.
Passing Snag Pond.
With the Thursday D-L crew working BR-1(?), PO-74 power waits. Wide cab leader to the mill today.
Passing ARMY, headed straight to the mill.
M420W leader, along with three six axles units running PO-74 straight to Arden Mill.
PO-74 power runs light along Ridge Row.
Eastbound through Moscow.
PO-74 power on the move. A beautiful day for a chase.
Readying to switch Keystone. The gates are controlled by a switch so not to tie up local traffic at the crossing.