The Springerville AZ (TEPX) coal loads head down the Lee Ranch Sub after loading at the new El Segundo Mine.
The Springerville AZ (TEPX) coal loads comes off the Lee Ranch Sub onto the main line at West Baca.
The rear DPU on the Springerville AZ (TEPX) coal loads head down the Lee Ranch Sub after loading at the new El Segundo Mine. The 2nd unit is 6615, one of the new ES44C4's.