Five BNSF units are tied down on a storage track in Longmont, CO, after arriving at a power plant in Boulder, CO with 105 loaded coal hoppers.
BNSF 9290 is one of five lite power units returning to Longmont, CO, after setting out 55 of 105 loaded coal cars at the Xcel Energy Power Plant in Boulder, CO. The units will return in a couple ... (more)
BNSF 9624 and four other units are seen making track speed of 40 MPH as they head out of Niwot, Colorado, and into Longmont, to tie the power down.
Lite Power led by BNSF 9624 is seen passing by the Longmont, CO Depot after setting out coal loads at the Xcel Energy Power Plant in Boulder, CO. The units will be tied down and the crew will retu... (more)