The Broadway Limited is racing west under the old Marietta Pike bridge, passing the crumbling station platforms at Mount Joy. The bridge has since been replaced, and Amtrak and the Commonwealth o... (more)
An EMD SW1 has removed the HEP (head-end power) car from the Broadway Limited and is preparing to position it for the next morning's eastbound run, to be pulled by GG-1 No. 4913, at the left of th... (more)
Doubleheaded GG-1s 4913-4912 have just brought the Broadway Limited in from New York. The crew is preparing to uncouple the locomotives for their trip to the motor track and couple up the diesels... (more)
Sunset literally and figuratively for GG-1s on the Broadway Limited, as the doubleheaded 4913 and 4912 are being prepared to be cut off for a trip to the motor track by Harris Tower. Note the fue... (more)
The 4935 has just uncoupled from the westbound Broadway Limited and is preparing to switch onto the "motor track" for tomorrow morning's eastbound run to New York. No. 4935 was built by... (more)