Due to construction work in the Gotthard Base Tunnel, passenger trains will be rerouted via the Gotthard mountain route from January 13 to 25, 2025 and the base tunnel will be available for freigh... (more)
Highspeed train "Giruno" RABe 501 # 022 of the SBB is running empty as 32437 from Stein-Säckingen via Gotthard Base Tunnel to Bellinzona, between Schinznach Dorf and Brugg joint line on... (more)