Susquehanna 142 heading back to Phillipsburg on the first excursion of the day.
Delaware River Railroad Susquehanna 2-8-2 142 making it's second trip of the day from Phillipsburg.
Susquehanna 142 backing to Phillipsburg on its second trip of the day.
First weekend back for Susquehanna 2-8-2 #142 hauling excursions after its 1472 day overhaul.
NYS&W SU99 rolls past the former Wyckoff passenger station.
SD33ECO 3012 shows off its big radiators at the NYS&W engine terminal.
NYS&W welded rail train is parked at the MC Yard, alongside the outbound SU99 road freight. This welded rail train had originated on CSX.
Susquehanna #142
Susquehanna #142 steams out of Phillipsburg with the first trip of the day.
Susquehanna 2-8-2 #142 heads south on the ex-PRR Bel Del Branch.
Susquehanna 142 backs down to pick up it's passengers for the first excursion of the day.
NYS&W's WS1 local freight has PRLX GP38-2 for power and former Chessie System caboose 0121 as a shoving platform.
Susquehanna 142 pushes its train back to Phillipsburg on its second trip of the day.
Susquehanna 142 heads south on the former PRR Bel-Del line, while a couple of cars on River Road, slow to take a look at the 2-8-2.