Locomotive 263 006 is pulling a train with excavated material from the "Stuttgart 21 Railway Station" construction aera to Rottweil.
Voith Maxima 263 006 heads a rake of container wagons loaden with excavated material from the Stuttgart-21 tunnel project. This train is bound for a waste disposal south of Rottweil
Mertz Kies- und Sandwerke GmbH & CO. KG. locomotive 264 013 (built 2009 by Voith Turbo Lokomotive GmbH & CO. KG.) is pulling an excavated material train to Rottweil. The excavated material is from... (more)