An NS frieght is about to cross the diamond with the Western New York and Pennsylvania RR just outside Olean NY.
This set of power was inbetween jobs.
Two sets of power rest inbetween jobs at the busy BBRR Yard in Doswell.
The Palmett0 (#89) pulls into the Staples Mill Rd Station. It was running late, and there was a 3 way meet in the station with 2 northbound Amtrak trains.
A roadslug set swithces the paper mill on a gorgeous fall morning.
Crews are busy replacing signals on the old RF&P. In the picture you can see them working on the signals (left side). A work train with ballast waits to assist in other installations, and a Trash ... (more)
This trio of units just dropped of a train of empties. The loads that they will replace are just to the left. The first unit almost looks white compared to the dark future units.
Making up a rather lenghty train is just another days work.
PO-89 was delayed slightly waiting on a signal at Doswell. There is a lot of maintenance going on up and down the old RF-P.
A four unit set of power rests in the yard. A colorful lash-up to say the least.
These units were awaiting assignment in Doswell, the rear unit was the only one running.
A brilliant winter day. However, the temperature was almost 70 degrees, which made it feel like spring time!!
Power awaiting service, hopefully a wash job too!!