The first Acela southbound carves a path through 2 feet of snow the day after the big 2010 blizzard that threw the mid Atlantic into chaos. Amtrak however kept running, though with fewer trains.
As the February 2010 blizzard begins to wind down, an HHP 8 slogs out of New Carrollton past a snowbound Metrorail facility. Amtrak manged to keep running in this storm.
The day after the historic blizzard of 2010, transportation is still in chaos, however Amtrak is running, even with half it's trains annulled. Here a southbound regional kicks up the snow.
The GP30 just won't die. Many live on performing industrial service just like this for Conrad Yelvington. This facility is located on the last segment, of the old Sorrento branch that used to conn... (more)