A 1971-built ex-Penn Central SD40 leads a train out of the now-closed 1904 Gallitzin Tunnel. The 1854 tunnel on the right, Summit, or Allegheny Tunnel, was rebuilt 1994-95 with two tracks and cle... (more)
NS 23Z heads up the Slide on Track 1 approaching AR Tower. Due to a small derailment in Cresson, all trains were routed via this line. Including several westbounds. This used to be a rare sight, b... (more)
NS 7235 and 7237 Helper units emerging from the Gallitzin tunnel from Altoona Pa on their way back to Cresson Pa. for the next need for help climbing Horseshoe Curve
NS AC44C6M is a rear helper on the back of 12G. About to duck under the new eastbound signalbridge at AR Interlocking. This was the last trip of 4299 in helper service before being moved to road s... (more)
Slowly making its way upgrade toward the Galitzin tunnels, westbound containers make their way out of Horseshoe curve in the beautiful Pennsylvania fall foliage.