The quiet country station of Wellington Bridge was totally transformed during the sugar beet season between September and January each year. It was the last remaining loading point for this traffi... (more)
039 pulls away from Waterford with a loaded sugar beet train from Wellington Bridge to the processing factory at Mallow. Sadly, this traffic no longer runs.
012 waits in Waterford Yard with a portion for a liner train. These locos were built by Metropolitan Vickers in 1955 - 56 but were later rebuilt by CIE with GM 12-645E engines.