506 passes Lake Harbor whilst hauling a train of sugarcane from Bryant to Clewiston, 23 Nov 2017
303 approaches Bryant with a rake of loaded sugarcane, 22 Nov 2017. At Bryant 303 will swap it`s loaded cars for empties and return back to the fields for loading...
Cane 1 rumbles through downtown Clewiston as smoke rises from cane fields being set alight in the distance. The burning of cane fields is part of the harvesting process.
Cane 1 returns for the mill as the cane field burns to be made ready for harvest.
308 powers away from Moore Haven as it hauls empty sugarcane wagons back to the fields for loading, 22 Nov 2017
Cane 1 brings loads back toward the mills in Clewiston. Note the "LED" headlamps. Sugar season runs to April and the "giant model railway" will be in action through then.
Cane 1 returns for the mill as the cane field burns behind the train. The burning of the cane fields is part of the harvesting process, burning off parts not used to make sugar.
312 drops off tank wagons at Belle Glade sugar mill
308 crosses the swing bridge at Moore Haven whilst hauling a rake of empty sugarcane cars, 22 Nov 2017
506 picks up sugarcane cars at Belle Glade loading point