The end is near for GG1-powered passenger trains between Philadelphia and Harrisburg, as the fireman looks to the rear to watch the carman prepare for the uncoupling. The 4935 would have the hono... (more)
After 2 safety stops, the final double was being made on the last 261 Triplecrown Roadrailer train at Rutherford Yard. After the hitch was made, it was off to the rear for the brake test and some ... (more)
The last 261 Triplecrown roadrailer is finally built and the conductor and Road and Rail supervisor tend to the marker for the final brake test before departure. Power for the train was NS 6782-UP... (more)