On Sunday 19th October 2014, track renewal work took place through platform 2 at Paignton. During the early evening, Colas Rail DR73935 is seen sat on the south level crossing before tamping the l... (more)
After a good storm the VTR used this unique tamper/Snowplow to clear some of the line between White River Jct. and Newport.
Track machines entering the loop to make way for a train.