PN AN4-NR51 run light engine through Sim Street Junction.
After stalling just a kilometer short of the summit at Mt Loft, GWA engines GWU009 and FQ04 were sent to assist SCT Logistics service 2MP9 over the summit and down to Belair in the Adelaide Hills.... (more)
JT46C AN6 stabled at Goobang Junction Parkes waits for another trip west as NR1-NR8-NR28 working an intermodal east wait for a clear signal alongside.
Thats not snow the Locomotives are being splatered with but salt from the lake